PRLX 24, the EMD24B demonstrator unit, brings the 1400 UP Dock Job into Long Beach Junction with a cut of 15 wells from APL's Global Gateway South terminal bound for ICTF and eventually San Antoni... (more)
PHL's 1PM UP Dock Job has a long string of stacks on the coupler as it takes the Long Beach Sub and heads south into the spaghetti bowls of tracks ahead of it.